What's Hot: The Most Expensive Home In Chevy Chase Will Hit The Market For Just South Of $10 Million
A Look at the Plans For a Bridge Between the Arboretum and Anacostia Waterfront
✉️ Want to forward this article? Click here.
A key site along the Anacostia Riverwalk Trail is inching closer to construction.
Last night, the District Department of Transportation's (DDOT) Anacostia Waterfront Initiative and the National Park Service hosted the first of two public meetings to present plans for a pedestrian and cycling bridge connecting Kenilworth Park and the National Arboretum.
The ADA-accessible bridge would be roughly 14 feet wide and would be able to accommodate two lanes of traffic in either direction. The proposal also includes improvements along the riverfront in Kenilworth Park to create a floating dock and kayak launch, improved access for those using the river and its banks for recreational activity like fishing and educational purposes, and a trail connecting to the existing Anacostia Riverwalk Trail (ART).
story continues below
loading...story continues above
The Arboretum Bridge & Trail is intended to improve connectivity between neighborhoods along the southern banks of the Anacostia in Northeast DC (eg. Mayfair, River Terrace and Kenilworth-Parkside) and neighborhoods across the river like Navy Yard. Less clear, however, is how the bridge would function as a public trail when the arboretum is not open. The Arboretum draws over 500,000 visitors annually, with the grounds accessible almost daily from 8am to 5pm. Both sides of the bridge would sit on land administered by the National Park Service.
Upon completion of the entire stretch, from the Rock Creek Park Trail to Oxon Hill, Maryland, the Anacostia River Trail (ART) network will be 28 miles long.
The team is soliciting public feedback online for the next 30 days and will finalize a design in winter 2019-2020. The project is expected to break ground next year and deliver in 2022.
See other articles related to: anacostia river, anacostia riverfront, anacostia riverwalk trail, ddot, pedestrian bridge, u.s. national arboretum
This article originally published at https://dc.urbanturf.com/articles/blog/a-bridge-to-add-access-between-the-arboretum-and-anacostia-waterfront/15428.
Most Popular... This Week • Last 30 Days • Ever
If the home ultimately sells for around that list price, it would set a record as the... read »
When purchasing a home, it's crucial to conduct a thorough inspection to determine th... read »
The federal government could be shut down by the end of today, and that shutdown coul... read »
The multi-faceted project will include restaurant, bar, fitness and event spaces.... read »
Right on the heels of a $29 million home along Foxhall Road going under contract to T... read »
- Fox News Bret Baier's $29 Million DC Home Finds A Buyer
- A Home Inspection Primer For New Home Buyers
- How a Government Shutdown Could Affect Home Loans
- Union Market Lite? New Food Hall And Event Space Planned For H Street Corridor
- The Trump Effect Continues: $10 Million Georgetown Condo Goes Under Contract
DC Real Estate Guides
Short guides to navigating the DC-area real estate market
We've collected all our helpful guides for buying, selling and renting in and around Washington, DC in one place. Start browsing below!
First-Timer Primers
Intro guides for first-time home buyers
Unique Spaces
Awesome and unusual real estate from across the DC Metro