$5,000 to Go to the Front of the Line: Paying for Expedited Building Permits Goes Above-Board in DC
✉️ Want to forward this article? Click here.
In January, the DC Council introduced a bill that would split the city's Department of Consumer and Regulatory Affairs (DCRA) into two agencies in hopes of streamlining the building permit acquisition process. Around the same time, a new program was being enacted by DCRA that would also speed up the building permit acquisition process — for some.
This program created two routes for fast-tracked approvals: the Velocity Service for permit seekers whose plans and designs are 100 percent complete, and the Expedited Service for permit seekers whose plans are still in the design phase. Those that wanted to fast-track their permits must do an initial consultation in-person, over the phone or via web conference. They would then file their permit applications online and upload documents into a city database. If the DCRA Coordinator approves the project for fast-tracking, the applicant pays a $5,000 non-refundable deposit. There will be a number of meetings to review plans prior to permits being approved.
story continues below
loading...story continues above
The convenience of these fast-tracking programs comes at a steep cost: up to $75,000 in addition to the cost of permits. The standard Velocity program has a $50,000 fee for buildings smaller than 50,000 square feet, a $50,000 fee plus 50 cents per additional square foot for buildings sized from 50,001 to 99,999 square feet, and a fee of $75,000 for buildings 100,000 square feet or larger. For the Expedition Service program, the first plan review session is $5,000 for buildings smaller than 10,000 square feet or $10,000 for buildings larger than 10,000 square feet; each subsequent review session is $2,500 or $5,000, respectively.
While it may be too soon to draw any conclusions about the results of such a program existing, some homeowners have already begun feeling the stress of potentially-delayed permit processing, whether by design (as a revenue-raiser for DCRA) or as an unintended consequence of developers (which tend to have more disposable funds) skipping to the front of the line.
See other articles related to: building permits, dcra
This article originally published at https://dc.urbanturf.com/articles/blog/dcra-velocity-program/13787.
Most Popular... This Week • Last 30 Days • Ever
The high-end properties are set between the Potomac River/C&O Towpath and multiple pa... read »
In this edition of First-Timer Primer, we look at the ins and outs of the 203k loan.... read »
The largest residential conversion planned in the neighborhood is continuing to move ... read »
Plans for the large new residential project are looking to get started again after mo... read »
The residential pipeline in Adams Morgan has slowed in recent years, and now there ar... read »
- Two Stylish Single-Family Homes Debut in Walkable MacArthur Boulevard Location
- First-Timer Primer: What is a 203K Loan?
- 300-Unit Office-To-Residential Conversion in Georgetown Files Updated Design
- Plans Filed For 230-Unit Development At Brookland Metro Station
- The 4 Developments In The Works In Adams Morgan
DC Real Estate Guides
Short guides to navigating the DC-area real estate market
We've collected all our helpful guides for buying, selling and renting in and around Washington, DC in one place. Start browsing below!
First-Timer Primers
Intro guides for first-time home buyers
Unique Spaces
Awesome and unusual real estate from across the DC Metro