The DC Streetcar May Run to Benning Road Metro in 2026
✉️ Want to forward this article? Click here.
While the road to an extension of the DC streetcar has not been smooth, the project may get back on track next year.
On Tuesday, the District Department of Transportation (DDOT) released the final design for a project that would not only extend and add five stops to the streetcar, but would also rehabilitate or replace three bridges and add streetscape and intersection improvements along Benning Road between Oklahoma and Central Avenues NE.
The agency expects to bring a contractor on board to begin working on utility relocations along the route next spring or summer, enabling full construction and delivery of the streetcar extension in 2026.
story continues below
loading...story continues above
The new leg of the streetcar would run along a shared median lane. New stops would be created at Kingman Island (map), Benning Road and 34th Street NE (map), Benning Road and 39th Street NE (map), Benning Road and 42nd Street NE (map), and Benning Road Metro station (map). The latter terminus station was recently redesigned to create a plaza at the station entrance parallel to East Capitol Street NE.
The bridge over Kingman Lake and the Ethel Kennedy Bridge would both be rehabbed, adding guarded sidewalks on either side of the former and a guarded sidewalk and shared use path on either side of the latter.
The Lorraine Whitlock Memorial Bridge over I-295 would be replaced entirely, also including a sidewalk on one side and a shared use path on the other with parapets guarding either side. There would also be some improvements to reconfigure the connections between Benning Road and I-295, including new ramps.
DDOT is holding another public meeting on the Benning Road project this evening.
Related Post:
See other articles related to: benning road, benning road metro, dc streetcars, ddot, streetcar, streetcars
This article originally published at https://dc.urbanturf.com/articles/blog/the-dc-streetcar-may-run-to-benning-road-metro-in-2026/19058.
Most Popular... This Week • Last 30 Days • Ever
The high-end properties are set between the Potomac River/C&O Towpath and multiple pa... read »
In this edition of First-Timer Primer, we look at the ins and outs of the 203k loan.... read »
The largest residential conversion planned in the neighborhood is continuing to move ... read »
Plans for the large new residential project are looking to get started again after mo... read »
The residential pipeline in Adams Morgan has slowed in recent years, and now there ar... read »
- Two Stylish Single-Family Homes Debut in Walkable MacArthur Boulevard Location
- First-Timer Primer: What is a 203K Loan?
- 300-Unit Office-To-Residential Conversion in Georgetown Files Updated Design
- Plans Filed For 230-Unit Development At Brookland Metro Station
- The 4 Developments In The Works In Adams Morgan
DC Real Estate Guides
Short guides to navigating the DC-area real estate market
We've collected all our helpful guides for buying, selling and renting in and around Washington, DC in one place. Start browsing below!
First-Timer Primers
Intro guides for first-time home buyers
Unique Spaces
Awesome and unusual real estate from across the DC Metro